![]() The manufacturer of steel halls should only use materials which meet the requirements of European standards and regulations. ![]() It also contains full lists of the materials and fasteners needed. The workshop design is based on the technical design. Workshop design provides the contractor with the details on the structure class, surface treatment of the steel structure, corrosion and fire protection methods, the requirements for welds or the method of making openings. For each task, a detailed production technology and work schedule is prepared and the material from which the structural elements of the steel hall will be built is ordered. It is drawn up on the basis of technical documentation, quality assurance plans and product inspection and testing plans. The first stage in the manufacture of steel structures is preparing an order execution plan. A modern steel production plant operates on the basis of procedures and instructions approved by certificates (Factory Production Control in accordance with PN-EN 1090) and production management standards (Quality Management System in accordance with PN-EN ISO 9001). Both of these processes consist of several stages that lead to a steel-framed building. For a professional contractor, installation of a structure that is well made and delivered on time is a pleasure. ![]() ![]() Manufacturing steel structures is a precise and time-consuming process. Production and assembly of steel structures ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |